We work hard to make sure logistics and planning are sorted out in the weeks before we begin at a new site. But the first week is always interesting as our plans are put to test and efforts to logistically sort things are challenged. The reality is–we have a lot of equipment and until it is seen set up most people do not realize the space it takes.
Due to a special assembly at a site we wound up overlapping space. The beauty about our system and efforts is that when needed we can adjust on the fly and modify. In this case, it meant scaling down to four bikes instead of our usual eight–which worked out fine with the length/size of classes we had.
Sometimes you just have to go with it, something we pride ourselves on doing well.